Sweden in July 1982 close to Mellanfjärden
At anchor in the skerries off Fredrikstad
Anchored to a buoy near Rossö
On the way to Helgoland
At anchor in the Bay of Muros, Spain
In the Port of Delos, Greece
In the Port of Hydra, Greece
At anchor in a bay in the Ionian Sea, Greece
On the return journey: transit through the Corinth Canal, Greece
At anchor in the Bay of Ithaca, Greece
In the port of Corfu, Greece
On the return journey in the Adriatic, Yugoslavia
Participation in the Nioulargue in 1993, later known as "Les Voiles de Saint-Tropez"
In the port of Årø
A Nightcap in Schleimünde
Exit at Bågø By
Promoting Young Talent in Sønderborg
Sailing in Svendborg Sound
Sailing on Flensburg Fjord
Perfect weather and flowers in Drejø
Dark Clouds off Dyvig
In the harbour of Dyvig
At anchor in Vemmingbund
Evening mood at anchor in Vemmingbund
Entering Kappeln
Exit at Dyvig
Crossing the finish line just ahead of Rasmus (50-sq-meter Seagoing Cruiser)
Sailing with Spinnaker
Regatta
from top
Dead calm from Sønderborg to Hørup Hav
Thrilling Run Under Spinnaker
Sailing at Sønderborg
Sailing off Birkholm
Anchored west of Ærøskøbing
Young talent development off Ærø
Beating Upwind into Flensburg Fjord
Evening atmosphere at the berth at the FSC
Stern view of SKJOLD
The beautiful line from SKJOLD
Bow view of SKJOLD
The Run – Sailing into the Sunset
The Run - Sailing After Sunset
The Run - Sailing on the Svendborg Sound
Tornholmen, Sweden – Mooring at a Skerry
Tornholmen, Schweden - Mooring at a Skerry
Gullholmen, Sweden
Klåverön, Sweden - Aerial view
At Anchor with a Grill
Klåverön, Sweden - Passage between the rocks
Sailing with Tiller Steering
Night crossing from Anholt to Ebeltoft
Evening Mood in Mjels Vig
Parallel Sailing with Concordia Yawl, 30 Skerry and Piraya
Sailing Spinnaker
On the way to the Rendevouz
Deck Repair
Repair of Salon
Wet Room Repairs
Old Stuffing Box and Flange
Old Stuffing Box
Removal using a threaded rod
Stuffing box disassembled
New Paint for Engine Bay and Bilge
New Engine Compartment Sound Insulation
New stainless steel chain for cleaning the scuppers
Old deckhouse with damaged beams at the front starboard side
Damaged beams removed
Prepared for splicing
Deckhouse sanded down
Deckhouse: repaired area sanded down
Canvas sheet laid over the deckhouse
The linen canvas is stretched and nailed down
Installing a New Wooden Strip
Deckhouse with wooden slats and varnished top
Completed Works
Old Control Panel
New Control Panel
Damaged stem with rotten wood
Repaired stem with a steel profile designed to bear the load of the keel bolts.
Clear coat and white paint in the wet cell and salon—new.
Reinstallation of the old, refurbished wall linings
A new, wider bow fitting, allowing the anchor to be retrieved back onto the deck.